Friday, April 30, 2010

Finally Done!

All thats left of this...shall we say disappointing....studio is to print this mess and let the jury tell me how stupid I am. But that can't come close to tainting the fact that this studio is OVER. Though this was without a doubt one of the worst projects ive ever designed, Ill pretend it never happened and make up for lost time in my final 2 studios before thesis.

That said, some description of the project is still necessary...

For 7/8th of the semester, we did all sorts of research on materials, site, and program, then in the blink of an eye did what other studios spend the entire semester doing: designing, documenting, and analyzing a "complete" comprehensive design project. This is the result of that eye-blink.

Flexible/Adaptable Care Facility
Through the use of modular, flexible, and transportable methods of unit construction, this facility offers the ability to expand and contract as needed, with the additional possibility to provide in-field care during times of crisis. The overall structure not only serves as a space for flexible configurations but provides natural ventilation, shade, and a space for community.




Saturday, April 24, 2010

Media II Assignment 3 Shade Structure

Bus stop made with Rhino and Grasshopper, the 3d printed and painted.





Sunday, March 21, 2010

Media II Assignment II

Here are the final images for our second major project in media II





Thursday, March 11, 2010

Media II next assignment

Here are some snapshots from my next media project...taking the aperture pattern from the previous assignment and using it for a 1000 sqft pavilion





Friday, February 19, 2010

Design & Technology Workshop

Here are some images from this semesters D&T Workshop...We took a popular suburban cookie-cutter single family house plan and ultimately deconstructed it to house 3 units: studio, 1BR and 2BR







Wednesday, February 17, 2010