Round 4 for me was an attempt to operate within the existing usable structures on the site, rather than total new construction. The idea was to fold the ground plane up and into the buildings, allowing it to dictate the scale and space inside and to generate new spaces outside.
Monday, June 14, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment